{"id":4494,"date":"2026-03-03T16:47:15","date_gmt":"2026-03-03T21:47:15","guid":{"rendered":"https:\/\/thebulletinjournal.com\/?p=4494"},"modified":"2026-03-03T16:47:15","modified_gmt":"2026-03-03T21:47:15","slug":"seattle-power-hookups-are-slowing-middle-housing","status":"publish","type":"post","link":"https:\/\/thebulletinjournal.com\/?p=4494","title":{"rendered":"Seattle Power Hookups Are Slowing Middle Housing"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Introduction<\/h2>\n\n\n\n<p>Seattle\u2019s push for more \u201cmiddle housing\u201d and faster electrification is colliding with an unexpected constraint: the city\u2019s power distribution system. Developers and housing advocates say delays and costs tied to connecting new fourplexes and sixplexes to electricity are undermining project feasibility and, in some cases, stopping homes from being built. Seattle City Light argues the problem is structural and safety-driven, and that new density plus electric heat and vehicle charging are pushing overhead infrastructure beyond its limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A Fourplex Project Becomes a Cautionary Tale<\/h2>\n\n\n\n<p>Developer <strong>Perpetuity LLC<\/strong> said a fourplex in Seattle\u2019s <strong>Central District<\/strong> took more than <strong>two years<\/strong> to connect to power, longer than the construction itself, and cost more than <strong>$270,000<\/strong>. The company said the delays contributed to the project becoming unprofitable. Builders argue this experience is not isolated and reflects a wider bottleneck in utility coordination, permitting, and design timelines.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Policy Change That Raised the Stakes<\/h2>\n\n\n\n<p>In <strong>February 2025<\/strong>, Seattle City Light adopted a policy requiring new housing with <strong>four or more units<\/strong> on a lot to connect to the electrical grid <strong>underground<\/strong>. Previously, fourplexes could connect overhead using existing power poles. Developers say undergrounding often forces coordination across multiple city departments, with unpredictable permitting timelines and significant design and engineering work. Critics argue the rule treats small \u201cmiddle housing\u201d projects more like large multifamily buildings, shifting complexity and cost onto smaller builders.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why the Utility Says Overhead Connections Are Risky<\/h2>\n\n\n\n<p>Seattle City Light says recent housing and climate policies have increased electrical demand in ways that overhead systems were not built to accommodate. New state energy codes since <strong>2023<\/strong> have pushed electric heat pumps in new homes, and Seattle has required <strong>EV charging capability<\/strong> in new homes with off-street parking since <strong>2019<\/strong>. A lot that formerly held one home can now hold <strong>four homes<\/strong> in most areas and up to <strong>six<\/strong> near transit under the state\u2019s middle housing framework implemented locally last June.<\/p>\n\n\n\n<p>The utility argues that serving multiple electrified homes often requires heavier gauge wires and sometimes larger transformers, adding weight and mechanical stress to wooden poles. In storms, heavier lines and equipment can increase the risk of pole failure. Seattle City Light officials say undergrounding is the safest way to handle the load, even if it is costly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who Pays and How Costs Hit Housing Supply<\/h2>\n\n\n\n<p>Undergrounding can require conduit, concrete vaults, street restoration, traffic control plans, and coordination to avoid other utilities. It becomes more complex when lines are on the opposite side of the street, which may require boring under public right of way and additional permits.<\/p>\n\n\n\n<p>Builders report that costs can be large and timelines can be worse. Some say City Light\u2019s internal process averages <strong>8 to 10 months<\/strong> but can stretch to <strong>two to three years<\/strong>, leaving finished buildings waiting for power while carrying high interest payments. One builder reported undergrounding and associated street work added more than <strong>$700,000<\/strong> to a <strong>$12 million<\/strong> townhome project. Housing advocates warn that when costs rise, fewer homes get built, tightening supply and pushing prices upward.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Early Signals and Permitting Trends<\/h2>\n\n\n\n<p>Seattle issued permits for <strong>9% fewer<\/strong> townhome and row house units in <strong>2025<\/strong> compared with the prior year, dropping from <strong>634<\/strong> to <strong>579<\/strong>, even as more lots became eligible for fourplexes and sixplexes. Builders say high interest rates and pricing conditions already squeeze projects, and the undergrounding rule adds another barrier, especially for small developers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Potential Fixes Under Consideration<\/h2>\n\n\n\n<p>Seattle City Light is exploring alternatives that could preserve overhead connections while reducing pole risk. One option is installing stronger poles, including thicker fiberglass poles that may support heavier equipment. The utility has indicated it may begin limited pilot testing with developers later this year, while noting potential neighborhood concerns about aesthetics.<\/p>\n\n\n\n<p>Another option is the use of <strong>smart electrical panels<\/strong> that can manage peak loads by throttling specific circuits such as EV charging. This approach could allow multiple units to share a thinner overhead service line if aggregate load stays within limits. However, Seattle City Light notes a barrier: smart panels are not yet recognized for this purpose under the <strong>National Electric Code<\/strong>. Wider adoption could also change how residents think about electricity use, including peak timing and shared constraints.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p>Seattle\u2019s effort to build more homes and electrify buildings is running into a practical infrastructure constraint that developers say is slowing projects, raising costs, and chilling middle housing construction. Seattle City Light views undergrounding as a safety-driven response to heavier loads from added density, heat pumps, and EV readiness. The debate now centers on how to distribute costs and risks so that electrification does not unintentionally reduce housing supply. Pilot programs for stronger poles and smart panels could offer a path forward, but scaling any solution will require coordination, clearer timelines, and a financing approach that aligns utility engineering with housing goals.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction Seattle\u2019s push for more \u201cmiddle housing\u201d and faster electrification is colliding with an unexpected constraint: the city\u2019s power distribution system. Developers and housing advocates say delays and costs tied to connecting new fourplexes and sixplexes to electricity are undermining project feasibility and, in some cases, stopping homes from being built. Seattle City Light argues<\/p>\n","protected":false},"author":5,"featured_media":4495,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40],"tags":[432,427,429,428,433,425,430,424,431,426],"ppma_author":[44],"class_list":{"0":"post-4494","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-climate","8":"tag-electrification","9":"tag-ev-charging","10":"tag-fourplex","11":"tag-heat-pumps","12":"tag-housing-affordability","13":"tag-middle-housing","14":"tag-power-pole-capacity","15":"tag-seattle-city-light","16":"tag-sixplex","17":"tag-undergrounding-power-lines"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Seattle Power Hookups Are Slowing Middle Housing - The Bulletin Journal<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thebulletinjournal.com\/?p=4494\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Seattle Power Hookups Are Slowing Middle Housing - The Bulletin Journal\" \/>\n<meta property=\"og:description\" content=\"Introduction Seattle\u2019s push for more \u201cmiddle housing\u201d and faster electrification is colliding with an unexpected constraint: the city\u2019s power distribution system. Developers and housing advocates say delays and costs tied to connecting new fourplexes and sixplexes to electricity are undermining project feasibility and, in some cases, stopping homes from being built. Seattle City Light argues\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thebulletinjournal.com\/?p=4494\" \/>\n<meta property=\"og:site_name\" content=\"The Bulletin Journal\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-03T21:47:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Sarah Haddad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sarah Haddad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#article\",\"isPartOf\":{\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494\"},\"author\":{\"name\":\"Sarah Haddad\",\"@id\":\"https:\/\/thebulletinjournal.com\/#\/schema\/person\/e194d8212a7160ae20c889797af3a08d\"},\"headline\":\"Seattle Power Hookups Are Slowing Middle Housing\",\"datePublished\":\"2026-03-03T21:47:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494\"},\"wordCount\":803,\"publisher\":{\"@id\":\"https:\/\/thebulletinjournal.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png\",\"keywords\":[\"electrification\",\"EV charging\",\"fourplex\",\"heat pumps\",\"housing affordability\",\"middle housing\",\"power pole capacity\",\"Seattle City Light\",\"sixplex\",\"undergrounding power lines\"],\"articleSection\":[\"Climate\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494\",\"url\":\"https:\/\/thebulletinjournal.com\/?p=4494\",\"name\":\"Seattle Power Hookups Are Slowing Middle Housing - The Bulletin Journal\",\"isPartOf\":{\"@id\":\"https:\/\/thebulletinjournal.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage\"},\"image\":{\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png\",\"datePublished\":\"2026-03-03T21:47:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thebulletinjournal.com\/?p=4494\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage\",\"url\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png\",\"contentUrl\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png\",\"width\":1200,\"height\":800,\"caption\":\"seattle-power-hookups-are-slowing-middle-housing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thebulletinjournal.com\/?p=4494#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thebulletinjournal.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Seattle Power Hookups Are Slowing Middle Housing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thebulletinjournal.com\/#website\",\"url\":\"https:\/\/thebulletinjournal.com\/\",\"name\":\"The Bulletin Journal\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/thebulletinjournal.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thebulletinjournal.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/thebulletinjournal.com\/#organization\",\"name\":\"The Bulletin Journal\",\"url\":\"https:\/\/thebulletinjournal.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thebulletinjournal.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/The-Bulletin-Journal.png\",\"contentUrl\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/The-Bulletin-Journal.png\",\"width\":800,\"height\":124,\"caption\":\"The Bulletin Journal\"},\"image\":{\"@id\":\"https:\/\/thebulletinjournal.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/thebulletinjournal.com\/#\/schema\/person\/e194d8212a7160ae20c889797af3a08d\",\"name\":\"Sarah Haddad\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thebulletinjournal.com\/#\/schema\/person\/image\/9292de44020e54327c272e47664216e7\",\"url\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Sarah-Haddad.png\",\"contentUrl\":\"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Sarah-Haddad.png\",\"caption\":\"Sarah Haddad\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Seattle Power Hookups Are Slowing Middle Housing - The Bulletin Journal","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thebulletinjournal.com\/?p=4494","og_locale":"en_US","og_type":"article","og_title":"Seattle Power Hookups Are Slowing Middle Housing - The Bulletin Journal","og_description":"Introduction Seattle\u2019s push for more \u201cmiddle housing\u201d and faster electrification is colliding with an unexpected constraint: the city\u2019s power distribution system. Developers and housing advocates say delays and costs tied to connecting new fourplexes and sixplexes to electricity are undermining project feasibility and, in some cases, stopping homes from being built. Seattle City Light argues","og_url":"https:\/\/thebulletinjournal.com\/?p=4494","og_site_name":"The Bulletin Journal","article_published_time":"2026-03-03T21:47:15+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png","type":"image\/png"}],"author":"Sarah Haddad","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sarah Haddad","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thebulletinjournal.com\/?p=4494#article","isPartOf":{"@id":"https:\/\/thebulletinjournal.com\/?p=4494"},"author":{"name":"Sarah Haddad","@id":"https:\/\/thebulletinjournal.com\/#\/schema\/person\/e194d8212a7160ae20c889797af3a08d"},"headline":"Seattle Power Hookups Are Slowing Middle Housing","datePublished":"2026-03-03T21:47:15+00:00","mainEntityOfPage":{"@id":"https:\/\/thebulletinjournal.com\/?p=4494"},"wordCount":803,"publisher":{"@id":"https:\/\/thebulletinjournal.com\/#organization"},"image":{"@id":"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage"},"thumbnailUrl":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png","keywords":["electrification","EV charging","fourplex","heat pumps","housing affordability","middle housing","power pole capacity","Seattle City Light","sixplex","undergrounding power lines"],"articleSection":["Climate"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/thebulletinjournal.com\/?p=4494","url":"https:\/\/thebulletinjournal.com\/?p=4494","name":"Seattle Power Hookups Are Slowing Middle Housing - The Bulletin Journal","isPartOf":{"@id":"https:\/\/thebulletinjournal.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage"},"image":{"@id":"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage"},"thumbnailUrl":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png","datePublished":"2026-03-03T21:47:15+00:00","breadcrumb":{"@id":"https:\/\/thebulletinjournal.com\/?p=4494#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thebulletinjournal.com\/?p=4494"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thebulletinjournal.com\/?p=4494#primaryimage","url":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png","contentUrl":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Seattle-Power-Hookups-Are-Slowing-Middle-Housing.png","width":1200,"height":800,"caption":"seattle-power-hookups-are-slowing-middle-housing"},{"@type":"BreadcrumbList","@id":"https:\/\/thebulletinjournal.com\/?p=4494#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thebulletinjournal.com\/"},{"@type":"ListItem","position":2,"name":"Seattle Power Hookups Are Slowing Middle Housing"}]},{"@type":"WebSite","@id":"https:\/\/thebulletinjournal.com\/#website","url":"https:\/\/thebulletinjournal.com\/","name":"The Bulletin Journal","description":"","publisher":{"@id":"https:\/\/thebulletinjournal.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thebulletinjournal.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/thebulletinjournal.com\/#organization","name":"The Bulletin Journal","url":"https:\/\/thebulletinjournal.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thebulletinjournal.com\/#\/schema\/logo\/image\/","url":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/The-Bulletin-Journal.png","contentUrl":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/The-Bulletin-Journal.png","width":800,"height":124,"caption":"The Bulletin Journal"},"image":{"@id":"https:\/\/thebulletinjournal.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/thebulletinjournal.com\/#\/schema\/person\/e194d8212a7160ae20c889797af3a08d","name":"Sarah Haddad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thebulletinjournal.com\/#\/schema\/person\/image\/9292de44020e54327c272e47664216e7","url":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Sarah-Haddad.png","contentUrl":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Sarah-Haddad.png","caption":"Sarah Haddad"}}]}},"authors":[{"term_id":44,"user_id":5,"is_guest":0,"slug":"registeelopiuvhblai89u2ghklhgas","display_name":"Sarah Haddad","avatar_url":{"url":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Sarah-Haddad.png","url2x":"https:\/\/thebulletinjournal.com\/wp-content\/uploads\/2026\/03\/Sarah-Haddad.png"},"0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/posts\/4494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4494"}],"version-history":[{"count":1,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/posts\/4494\/revisions"}],"predecessor-version":[{"id":4496,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/posts\/4494\/revisions\/4496"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=\/wp\/v2\/media\/4495"}],"wp:attachment":[{"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4494"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/thebulletinjournal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fppma_author&post=4494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}